MK Engineers & Constructors Pvt. Ltd
MK Engineers & Constructors Pvt. Ltd has successfully delivered solar energy projects across industrial, commercial, and institutional sectors in Pakistan. Our portfolio reflects our technical capability, project management expertise, and commitment to delivering efficient and reliable renewable energy solutions at scale.
Completed Solarization Projects
A&M Oil – 1 MW Solarization
Beco Steel Mill – 2.2 MW Solarization
Latif Ghee Mill – 1.2 MW Solarization
Umar Din Rice Sheller – 999.35 kW Solarization
Nisar Rice Mill – 997.6 kW Solarization
Kohat University – 1 MW Solarization
MA Food Industries Pvt. Ltd – 0.6 MW Solarization
Oil Trade Pvt. Ltd – 996 kW Solarization
Case Studies
See How We’re Powering a Sustainable Future
Turnkey Transmission Line Project
220 kV Gwadar
MKEC served as a subcontractor for the 220 kV Gwadar Turnkey Transmission Line project, providing construction, project management, and technical support. Our team ensured smooth execution, efficient resource management, and timely completion of all project activities in coordination with the main contractor, SUNIR, and the client, NTDC.
Sukhi KINARI
500 kV Transmission Line
MKEC provided construction and technical services for the Sukhi KINARI 500 kV Transmission Line, including access road construction, site and store management. The team also conducted detailed surveys, soil investigations, and designed conventional foundations to ensure structural reliability and efficient project execution.
Latif Ghee Mill
100 Mega Watt Solarization
MKEC completed a 1.2 MW solarization project for Latif Ghee Mill, providing a stable and efficient renewable energy solution. The system was designed to maximize rooftop and available space utilization while ensuring consistent power generation.
NESPAK House
750 kW Solarization Project
MKEC delivered a 750 kW on-grid solar power system at NESPAK House, completed within five months using TBEA 110 inverters, covering full design, supply, installation, testing, and commissioning of the parking shed solar system to provide reliable, cost-efficient, and sustainable energy.
A&M Oil
1 MW Solarization
MKEC successfully delivered a 1 MW solar power system for A&M Oil, designed to reduce operational energy costs and dependency on conventional power sources. The project was executed with optimized system design to ensure reliable performance and long-term energy efficiency.
Beco Steel Mill
2.2 MW Solarization
For Beco Steel Mill, MKEC implemented a 2.2 MW solar energy solution tailored to high industrial power demand. The system supports uninterrupted operations while delivering significant cost savings and improved energy sustainability.
Quaid-e-Azam Solar Park
100 Mega Watt Solarization
Executed a 100 MW solar park project at Quaid-e-Azam Solar Park, contributing to Pakistan’s renewable energy capacity with high-efficiency solar infrastructure.
Umar Din Rice Sheller
999.35 kW Solarization
A 999.35 kW solar power system was installed for Umar Din Rice Sheller to support continuous production operations. The project focused on high system efficiency, optimal layout, and reliable energy output, contributing to reduced energy costs and environmental impact.
Nisar Rice Mill
997.6 kW Solarization
MKEC successfully implemented a 997.6 kW solar power system for Nisar Rice Mill, designed to support continuous industrial operations. The project ensures reliable energy generation, reduced electricity costs, and long-term operational efficiency.
MA Food Industries Pvt. Ltd.
0.6 MW Solarization
MKEC completed a 0.6 MW solar installation for MA Food Industries Pvt. Ltd., providing an efficient and cost-effective renewable energy solution. The project was designed to optimize available space while delivering consistent energy output for industrial use.
Oil Trade Pvt. Ltd.
996 kW Solarization
MKEC provided construction and technical services for the Sukhi KINARI 500 kV Transmission L
A 996 kW solar power system was installed for Oil Trade Pvt. Ltd. to enhance energy reliability and operational sustainability. The system was engineered to meet industrial load requirements while ensuring long-term performance and environmental benefits.
ine, including access road construction, site and store management. The team also conducted detailed surveys, soil investigations, and designed conventional foundations to ensure structural reliability and efficient project execution.
Oursun Cement
50 Mega Watt Solarization
Completed a 50 MW industrial solarization project for Oursun Cement, enhancing energy reliability and promoting sustainable manufacturing practices.
Attock Cement
20 Mega Watt Solarization
Successfully implemented a 20 MW solar power project at Attock Cement, delivering efficient, sustainable energy solutions to reduce operational costs and carbon footprint.
Kohat University
1 Mega Watt Solarization
Implemented a 1 MW solar project at Kohat University, providing clean, renewable energy to support the campus’s sustainable energy initiatives.
NTDC
78 kW Solar Installation Project
MKEC successfully completed a 78 kW solar installation for NTDC within five months, delivering end-to-end services including system design, supply, installation, testing, and commissioning of the parking shed solar setup to ensure efficient, reliable, and sustainable energy generation.